State College Train Station History: A Journey Through Time

The story of the State College train station is intertwined with the evolution of transportation in central Pennsylvania, the growth of Penn State University, and the rise and fall of local industries. From its humble beginnings as a connection point on a short-line railroad to its eventual abandonment, the station's history reflects broader trends in American transportation and economic development.

The Pennsylvania Railroad and its Expansion

The Pennsylvania Railroad (PRR), which eventually grew into the single largest and most important line in America spanning 28,000 miles, had its roots in a second, desperate attempt to keep Philadelphia competitive with New York and Baltimore. This was after it became evident that the Main Line Canal/Portage Railroad system would not do the job. The PRR began its westward expansion from Harrisburg, following the Pennsylvania Main Line Canal for much of its route and clinging to the valley wall above the Juniata River.

Soon after the Civil War, the PRR expanded into a great trunk line, connecting major cities like Philadelphia, New York, Baltimore, and Washington with the Midwest, including Cleveland, Cincinnati, Indianapolis, St. Louis, and Chicago. Lewistown became a crucial junction point, necessitating a complex of facilities such as an engine house, turntable, freight and passenger stations, a scale house, and two freight yards. The current depot in Lewistown, originally a freight station dating from 1849, began serving passengers in 1868.

The PRR also stimulated local growth by opening "commutation" railroads, feeder lines built in exchange for the Legislature's commutation of a tonnage tax enacted during the canal era. In 1871, the PRR opened the Sunbury and Lewistown Railroad, a branch extending eastward through McClure, Middleburg, and Selinsgrove, connecting at Sunbury for destinations north and south. In 1892, the Kishacoquillas Valley Railroad, a connecting short line, opened between Reedsville and Belleville, even running a Saturday afternoon movie train for rural residents. From 1900 to 1932, residents could ride trolleys of the Lewistown and Reedsville Electric Railway directly to the PRR depot.

The Bellefonte Central Railroad and State College

Until George Atherton’s tenure as president of the university, Penn State remained without a railroad station within several miles of campus. Traveling students needed to take trains to the closest towns with a station, then take buggies several miles to campus.

Read also: Comprehensive Guide to KSU Printing

In 1892, the Bellefonte Central Railroad (BCRR) made its way into State College, connecting the university and the burgeoning community to the outside world. A 67-by-30-foot Queen Anne station was erected on the site of the current Hammond Building along College Avenue. The trip between Bellefonte and State College was scheduled to take 50 minutes with all stops for the roughly 20-mile run.

The Bellefonte Central Railroad began in 1886 as the Buffalo Run, Bellefonte, and Bald Eagle Railroad. It was primarily used for hauling iron ore. However, as the iron industry started to decline in Bellefonte, the railroad went under and had to be sold. It was at this point when the railroad company decided to extend a branch from Struble to State College in order to carry passengers to Penn State. Because of the university’s growth, a market for transportation arose; students had to get to State College somehow. The Penn State Power Plant also served as a major revenue source for the railroad company. In order to sustain the plant, Penn State needed shipments of coal. Since the coal was shipped via railroad, the company began to haul passengers along with the coal on the short branch from Struble to State College.

The railroad line - which now ran to State College - opened its doors for more students to come to Penn State. As transportation methods developed over the years, students had the capability to travel by automobile, but no major interstates connected Pennsylvania’s to State College. The Bellefonte Central Railroad did, however, and it was utilized as the primary method of transportation to Penn State. The railroad ultimately linked the isolated areas of central Pennsylvania to major cities such as Pittsburgh, Philadelphia, and Buffalo. Numerous mining operations began to open around the State College area, which helped sustain passenger trains to State College. As mining operations reached its peak, passenger trains to State College began to experience a similar peak in operation.

The Bellefonte Central Railroad (reporting mark BFC) was a shortline connecting Bellefonte and State College, Pennsylvania. Constructed in the late 19th century to haul local iron ore to furnaces in the Bellefonte region, it later hauled freight traffic to Penn State and lime for steelmaking from local quarries.

The railroad was originally incorporated on September 21, 1882, as the Bellefonte and Buffalo Run Railroad. The purpose of this line was to connect Bellefonte with Pennsylvania State College, and to tap the iron ore deposits along Buffalo Run. This would replace the inefficient wagons used to haul ore to the iron furnaces at Bellefonte. The local iron and agricultural interests who chartered the road contracted out construction to Frank McLaughlin, a Philadelphia businessman, in exchange for a majority of the stock; he turned construction over to his business associates, the Collins brothers. In the meantime, McLaughlin and others chartered the Nittany Valley and Southern Railroad in January 1883. This line was proposed to run from Bellefonte to Mill Hall, providing a connection with the Beech Creek Railroad. (The Bellefonte & Buffalo Run's only connection in Bellefonte was the Pennsylvania Railroad.) However, capital was not forthcoming, and construction of the Bellefonte & Buffalo Run ended with the completion of the grading from Bellefonte to Struble in June 1883. This grade followed Buffalo Run from Bellefonte to Waddle, where a horseshoe curve carried it across and out of the valley and it climbed eastward to the summit at Alto.

Read also: UW-Madison Tuition Requirements

The Bellefonte & Buffalo Run and Nittany Valley & Southern were merged on March 16, 1885, to form the Buffalo Run, Bellefonte and Bald Eagle Railroad, under the presidency of James A. Beaver. The new company began to lay rail on the grade in April 1886, and began shipping ore from Lambourn Bank (near Waddle) to the McCoy & Linn furnace in Bellefonte in January 1887. The Collins brothers also invested in local ore banks, including those at Red Bank. This was reached by a branch from Mattern Junction, on the horseshoe curve near Waddle. To smelt the ore, they began building Bellefonte Furnace near the new railroad's enginehouse in Coleville, on the outskirts of Bellefonte.

The loss of traffic from Bellefonte Furnace hurt the railroad, which was sold at foreclosure on December 1, 1891. The new railroad was organized under the presidency of Robert Frazer, a precocious civil engineer formerly employed by the Lehigh Valley Coal Company. Frazer's first goal was to reduce dependence on ore traffic by extending the railroad from a wye at Struble to State College. The branch would carry passenger traffic, less-than-carload freight, and coal for the college power plant. Because of the railroad's slender financial reserves, the Oreland Branch was removed and its rails used for the State College extension. The first train ran over the new branch on April 2, 1892. The original station was located at College Avenue and Frazier Street and built in the Queen Anne style. The building of the extension also increased passenger service, with three trips per day (except Sunday) each way from Bellefonte to State College, and two per day each way from Waddle to Red Bank. The Bellefonte Central also promoted passenger traffic by building an amusement park on the former Benjamin Hunter farm, which it called Hunter's Park, and by investing in the University Inn, which provided hotel accommodations for visitors to Penn State and had its own stop on the railroad. However, the railroad discontinued passenger service on the Red Bank Branch in 1894.

Since the shutdown of Bellefonte Furnace, President Frazer had been trying to reach a rate agreement with John Reilly of the furnace company. They came to terms in July 1892, and Reilly began making arrangements to restart ore mining and put the furnace back in blast. It resumed ironmaking in March 1893, and the Bellefonte Central acquired additional ore cars to serve the traffic. At the end of April, Tom Shoemaker resigned as superintendent to tend to his expanding duties supervising Bellefonte Furnace and ore mining at Graysdale. He was replaced by Francis H. Thomas, a long-time Reading employee.

Unfortunately, the new furnace traffic would prove ephemeral. The Panic of 1893 forced Bellefonte Furnace to shut down again in July, after only four months of operation. Despite the poor economic times, the railroad's management remained confident. On May 10, 1894, the directors approved the extension of the main line from Struble to Pine Grove Mills. Such an extension had been contemplated as long ago as 1884, during the BRB&BE era. While Pine Grove Mills would originate some traffic through farming and logging, the extension was primarily contemplated as part of a larger route. By extending south from Pine Grove Mills to Huntingdon, the line could connect with the Huntingdon and Broad Top Mountain Railroad, an independent railroad serving the Broad Top coal region. By linking to the Central Railroad of Pennsylvania at Bellefonte (built in 1893 over the contemplated Nittany Valley & Southern route), the Bellefonte Central could form part of a coal route tapping the Broad Top field on behalf of the New York Central. However, the route faced a formidable obstacle in the crossing of Tussey Mountain. Such a line would require switchbacks or a long summit tunnel. The Pennsylvania Railroad already occupied the only usable gap at Spruce Creek and would not look favorably on its new competitor for the Broad Top traffic. However, the economy remained slow, and the railroad found it difficult to obtain land at favorable prices. After a little grading, the project stalled until 1896, when the railroad lifted the rail from the derelict Red Bank Branch west of Graysdale and used it to lay track on the extension. Service on the extension opened to Bloomsdorf in September 1896 and to Pine Grove Mills in December. Despite a $75,000 subscription offered by the town of Stone Valley (now submerged under Lake Perez) to complete the extension to Huntingdon, the expense of further extension would clearly have outstripped the railroad's finances.

Despite the loss of ore traffic, the Bellefonte Central had managed to keep its financial house in good order during the 1890s. Penn State University had begun to represent an important source of freight and passenger traffic, although the railroad frequently clashed with the school over unpaid bills. In 1896, Professor John Price Jackson obtained permission from the railroad to run trolley wire over its tracks from State College to Struble.

Read also: Westfield State University Legacy

Ore traffic did see a resurgence, as the re-opened Bellefonte Furnace went from sporadic operation during the 1890s to a more sustained level in 1899 and 1900. To supply additional iron ore, the owners of the furnace bought the ore pits around Scotia from the Carnegie interests, who were switching to Mesabi Range ore. The Bellefonte Central relaid almost a mile of the abandoned Red Bank Branch from Graysdale to the mines of Mattern Bank and built a new line from Graysdale to Scotia to reach the Scotia mines, previously served by the Fairbrook Branch of the PRR. However, the railroad lost some of the furnace traffic in 1899 to the Central RR of PA. This railroad was owned by the same interests as Bellefonte Furnace, and in that year, it built a long trestle over the PRR to reach the furnace directly and connect with the Bellefonte Central. The furnace first switched its source of lime to a quarry along the Central RR of PA, instead of the Bellefonte Central, and in 1903, a new interchange between the Central RR of PA and the PRR allowed the furnace to shift inbound coke and outbound iron traffic to the Central as well.

Bellefonte Furnace closed on December 21, 1910, and Nittany Furnace in 1911. Their last contribution to the railroad's prosperity was the huge heaps of slag accumulated at the furnace sites: this was shipped over the Bellefonte Central to the PRR for use in construction projects. While the loss of furnace traffic would ultimately prove fatal to the Central RR of PA, the Bellefonte Central had found new sources of revenue.

The McNitt-Huyett Lumber Company opened a mill at Waddle in 1909 and built an extensive network of 36 inch (91.44 cm) gauge track into the Scotia area, dual-gauging the Scotia branch and making use of the abandoned rights-of-way from the area's iron-mining heyday. The local timber was soon exhausted, and the branches to Mattern Bank and Scotia were abandoned in 1915. However, McNitt-Huyett built further extensions, and continued to haul logs to the Waddle mill until about 1919. Furthermore, high calcium limestone deposits in Bald Eagle Mountain, on the north side of the Buffalo Run valley, were now being exploited, much of their production going to steel mills in Pittsburgh.

With dreams of expansion towards Huntingdon long gone, the branch to Pine Grove Mills was removed in 1919. However, a new opportunity to lengthen the railroad would arrive. In 1927, the PRR applied to abandon its little-used Fairbrook Branch. The Bellefonte Central, with the blessing of the Interstate Commerce Commission, bought the line from Fairbrook to Stover, and obtained trackage rights from Stover into Tyrone. A new line was built from Struble to Fairbrook (more direct than the roundabout and now abandoned route via Scotia), and service to Tyrone began in 1930. The object of the purchase was to send freight directly to the PRR main line at Tyrone, bypassing the circuitous route via Bellefonte. Furthermore, Professor Ernest L. Nixon (uncle of Richard Nixon) owned a large potato farm near Fairbrook and planned to turn the area into a major potato-growing region. Other traffic would include lumber, clay, and furnace slag. However, the resentful PRR refused to supply cars at Tyrone, and gave the same rate for interchange at Tyrone as at Bellefonte. Litigation over interchange at Tyrone continued until 1938, ending with a decision unfavorable to the Bellefonte Central. The railroad promptly filed to abandon the line from State College to Stover, but approval was not granted until May 1941.

Frustrated in its expansion attempt, the Bellefonte Central was sustained throughout the Great Depression by the shipment of construction material to State College. Penn State extensively expanded its campus in the late 1920s and 1930s, in part to keep up with increased enrollment during the Depression, and many supplies traveled over the railroad. A new station was built on North Atherton Street in State College in 1930, and the line was cut back to the power plant. (The Hammond Building now occupies the old right-of-way to the original station.) Shipments from the lime quarries fell as the steel industry collapsed, and Chemical Lime went into bankruptcy in 1935. However, the company continued operating during the bankruptcy, and was prompted to modernize its operations, building a new rail-served lime plant at "Chemical" and abandoning quarrying for deep-shaft mining. The outbreak of World War II and the ensuing industrial demand further increased lime traffic. The war also brought about a brief resurgence in the Bellefonte Central's original source of revenue, iron ore. The Scotia Mining Company was formed at the beginning of the war to resume mining in Scotia, and built a new ore washer in 1942. The ore was initially trucked to Waddle for shipment, but after it was determined to be insufficiently pure, the company obtained Reconstruction Finance Corp. money for further improvements. A new 3 mile (4.8 km) spur was built from the main line at Lagarde (Alto) to a new beneficiation plant at Scotia.

In 1917, the Bellefonte Central Railroad decided to abandon its service operations from Bellefonte to State College, reducing it to one single round trip Monday through Saturday. The railroad continued to carry passengers at this rate until 1964, when the Bellefonte Central Railroad suspended passenger service to State College.

Decline and Abandonment

After World War II, the entire railroad industry was adversely affected as trucks made steady gains in capturing freight that previously rode the rails. Carloads terminated at State College declined significantly from 1950 to 1970. Passenger service had ended long before then. For the railroad’s first twenty-five years, carrying people was an important part of its business. Its three daily State College round trips provided that community with convenient connections to Pennsylvania Railroad trains at Bellefonte. Ridership continued to tumble until the Bellefonte Central averaged fewer than one hundred riders annually by the 1930s. It officially exited the scheduled passenger business in 1946.

Trucks eventually devastated the railroad’s core business of limestone and lime. Rubber-tired competition, combined with poor service given by the Pennsylvania Railroad and its successor Penn Central, led to a significant decline in tonnage carried from 1960 to 1972. San Francisco-based Kyle Railways, an operator of short lines in several states, acquired the Bellefonte Central in 1975 but failed to reverse the downward trend.

While regular passenger service ended in 1946, post-war traffic remained strong, again largely on the basis of Penn State construction. The Bellefonte Central also carried construction materials for the building of local homes, as enrollment at Penn State increased under the GI Bill. Although the advent of trucking was steadily eating into the less-than-carload freight business, the railroad still handled bulk deliveries of food to Penn State and shipments of machinery, automobiles, and paper. While the delivery of coal to local homes ended in 1947, the railroad continued to haul about 470 cars per year of coal to supply the Penn State power plant. However, the best years of the railroad were now behind it: it recorded its highest operating income in 1955.

In 1959, Penn State switched to trucks for coal shipments to its power plant, and scheduled service to State College ended. The collapse in traffic further accelerated in the 1960s, with the general decline of the Northeastern railroads. As the Pennsylvania Railroad (Penn Central after 1968) deteriorated, rail shipments suffered increasingly long delays, for which the Bellefonte Central could not compensate. The era also saw the last passenger service over the railroad, a PRR special from Pittsburgh for the University of Pittsburgh-Penn State football game in 1964.

After years of attempting to generate new traffic in State College, the Bellefonte Central finally gave up on the southern end of its line in 1974. The last train left State College on July 22, 1974, and 13 miles (21 km) of rail were pulled up from State College to Chemical in 1976.

New management came to both the lime plant and the railroad in 1976. The plant was bought by Domtar, while the Bellefonte Central was sold to Kyle Railways. Prospects still appeared reasonable for the railroad, as the plant at Chemical (bought by Domtar in 1976) had an extensive customer base. Most of the lime produced there went to steel mills in Pennsylvania, New York, and Ohio. Ground lime was also shipped to glass manufacturers, and to chemical and paper companies. However, the Pennsylvania steel industry soon began to falter under the pressure of foreign competition and its own inefficiencies. As the steel industry fell, the lime market also collapsed, and Domtar shut down the plant at Chemical on July 1, 1982. The Bellefonte Central shut down the same day. The Chemical plant was sold in April 1983 to Confer Trucking, a local firm, which operated it at reduced capacity and had no need for rail service. Accordingly, the Bellefonte Central filed for abandonment in 1984. The 4.1 miles (6.6 km) from Chemical to Coleville were removed in spring 1985. However, the last mile of track from Bellefonte to Coleville was bought by the SEDA-COG Joint Rail Authority, in order to make use of the enginehouse at Coleville.

Legacy: From Rails to Trails

The Bellefonte Central had secured much of its right of way by means of easements rather than outright purchase, with the proviso that should the right of way cease being used as a railroad, it would revert to adjacent landowners. Most landowners initially expressed little enthusiasm for repurposing the railroad line as a hiking and biking trail. But as popular enthusiasm for rails-to-trails ventures burgeoned statewide, Penn State and local municipalities revisited the idea. Eventually a 1.3-mile segment of improved rail trail was constructed, starting near the end of McKee Street in State College and extending eastward, passing through the newly established Arboretum at Penn State. Several miles of largely unimproved rail trail extended beyond to Toftrees.

The Slow Pace of Change

In the early days of the run from Bellefonte to State College, one conductor made such an impact on students that he became a campus legend: G. Ross Parker. What is agreed upon is the train’s incredibly slow pace. Over time, freight cars would be added to the passenger service, slowing the pace to no more than a walk. It was not uncommon for passengers to get off the moving train to pick flowers and berries and have the engineer slow down at the top of the grades so they could climb back aboard! Another common occurrence was the proclivity for livestock to force the train to halt. Fred Pattee fondly recalled that Parker, when asked by some undergrads why he was stopping the train, said, “Calves on the track.